| Roof sheeting going up the easy way |
| Finishing the south side |
| Black roofing paper secured with strips till the roofing material arrives |
| Trenching for geothermal and water to the shop |
| Piping at the shop |
| Ross and I on a break |
| The gravel for the floor |
| Ross moving gravel |
| Final leveling before the foam |
More to come while the weather lasts.
Len
I am agog at your shop space - what are the dimentions?
ReplyDelete