A little tamping and then we can lay down the foam before the geothermal tubing is clipped in place.
 |
| A couple of passes and we're ready |
 |
| Cath put a layer of 1 inch foam around the perimeter for a thermal break to the side foundation |
 |
| Here's the floor foam ready to lay down |
 |
| The finished product |
Kieth's boys came and put down the geothermal tubing with a test to 50 pounds so the concrete boys will know if they spring a leak
 |
| Temporary pre-pour geothermal setup |
 |
| Piping in place |
 |
| Finish grading for water run-off |
 |
| Collecting shale rocks for the finish around the two front pillars |
We are scheduled for concrete on Monday, weather permitting.
Len