I spent all day building the platform and installing the pumps and other gubbins. The wiring is pretty straight forward just large sizes to deal with. After all was hooked up, the motors the grounds the temperature bulb the two control panels and the plumbing, I turned it on. There is supposed to be a three second delay and then the motors for the pumps start up. Just a lot of silence. We were having family for the weekend so this was not a good sign. I played for a while longer but to no avail. Called Beachcomber and they said, "see you next week". Oh well.
|