Thanksgiving weekend and the troops have arrived. I had made a list of jobs for the weekend so no one would feel left out,
Build fireplace
Nail beam
move stuff to garage
garage door plywood
foam doors and windows
Loft floor
remove silly roof part
insulation
dog gate
straps for big windows and patio doors
nails in deck hangers
deck blocking
Septic cleanout cover glued on
House wrap
move garage doors into the garage
glass in shop doors
shop doors stained
Cut upper shop trim piece
move pile of hardie plank
split wood
windows in backhoe and drain
cleanup lumber by master bedroom
trees down
wood chips under deck
deck strapping
We did get a number of them accomplished and then some
move stuff from shop to garage
dog gate
straps for big windows and patio doors
House wrap
move garage doors into the garage
glass in shop doors
split wood
Build fireplace
Kyla arrived first and we dropped a plumb line to find the center of the chimney on the new concrete pad.
High wire act |
Kyla and I placing glass in the shop doors. |
Now the big moment has arrived. Kyla found some refractory cement in Kelowna for the fireplace and that was all we were waiting for. Chris had arrived by now and Michael and Shannon followed. Kyla and Cath spent a good part of Sunday splitting wood along the driveway.
We waited over night for the base to cure before we continued.
Second tier is up |
Michael is placing the last piece. |
Adding some house wrap under the covered deck |
Securing the big window |
The geothermal drillers showed up Monday evening. We helped unload some pipe and tubing.
The compressor and pipe for the drilling. |
I think they will be starting on Thursday for drilling.
A great Thanksgiving meal was had by all thanks to our wonderful cook, Cathryn.
Len
No comments:
Post a Comment