Len tells me that the wood off the second lift was great - nice and straight and easy to put together. So he was able to finish the whole loft side before band practice. Today he will put up some trim at the rafters and hang the fan. Then he can move on to the more challenging great room ceiling. We have a bit of a system now which will really help, but need to use all four levels of scaffolding to reach the highest peak. That will mean lots of moving the scaffold back and forth as we only have one full set. In the loft we used it in two pieces next to each other so Len could do the whole row without having to move the scaffold.
My favourite part is moving the scaffold from the loft to the main floor. Actually easier than getting it up there, so that is a positive.
Will post some pictures later today or tomorrow.
Watch for it!
Cath
Friday, May 25, 2012
Wednesday, May 23, 2012
Off the Hook
I started the day very (not) bravely climbing up on the scaffold to help Len place some boards. Let's just say that my clinging to the rail and moving about very slowly didn't really offer that much help to Len. So I was banished to the main floor where, after some instruction, I cut a whole whack of boards and started to finish them. Meanwhile, up above, Len got another section and 2/3 finished before I said "enough".
On a totally different subject, here is my second crop of rhubarb. Made one of Mom's famous cakes and it was so yummy I made more today.
Tomorrow I am back to work, so Len will be hanging out by himself most of the day. I'm sure he will do just fine.
Cath
| The pile of lumber I cut "all by myself" |
| A great cut off saw |
| He's up there somewhere |
| Oh there he is! |
On a totally different subject, here is my second crop of rhubarb. Made one of Mom's famous cakes and it was so yummy I made more today.
| In my wonderful sink with 2 levels |
Cath
Tuesday, May 22, 2012
Out of my comfort zone
Yesterday we started putting up the ceiling fir. It is quite the job and unfortunately, it requires two people for some of the more stubborn boards. Thus the title of this blog. Now would be an EXCELLENT time for someone to visit/help. Someone who isn't afraid of heights, which lets most of my family off the hook.
| Looks like fun |
| Lots of pecans and a few raisins, lots of butter and brown sugar |
Today we cut and finished most of the pile we had brought in and hauled it all up to the loft.
| Len cutting, my finished boards are leaning on the scaffold |
| Assembly line |
| Clamps and straps - no nails into the posts or beams |
| Cleverly placed floor joists |
| Plywood completes the floor |
| No way up except the ladder (rats!) |
| The false floor from the top |
| Working on the last row |
| Len off to modify some boards - looks like he enjoys the ladder business |
| First section done |
| Another excellent use for the ladder |
Monday, May 21, 2012
Painting part 1 is done
It was probably best that you didn't visit us for the long weekend. The weather wasn't exactly welcoming what with rain and wind. We did have two visitors, the natural types who didn't care so much about the weather.
We have been trying to get some small things done in preparation for the next BIG job, that of doing the ceiling of the vaulted roof. We both did some painting, although I did the easier job of the loft while Len took to perching on the scaffold.
Once all the painting of the main level was done (ta da!) Len put up some lighting fixtures and fiddled about getting them to come on and off with the flick of a switch. He also added some dimmer switches to the kitchen pot lights.
I have taken a few days off work and so will be available to do more priming and painting - this time in the basement with a new colour.
To get ready for the main event, we brought in a pile of wood. The living room just doesn't seem right without a pile of wood! This fir is for the ceiling, so I am off to town to get some more rollers, brushes and varnish.
Stay tuned for major VP (visual progress)
Cath
We have been trying to get some small things done in preparation for the next BIG job, that of doing the ceiling of the vaulted roof. We both did some painting, although I did the easier job of the loft while Len took to perching on the scaffold.
| Len painted the upper areas on both sides of the great room |
| I felt safer with the floor of the loft below me |
| Putting up one of 4 lighting fixtures |
| Another little job - the door bell is ready for ringing |
I have taken a few days off work and so will be available to do more priming and painting - this time in the basement with a new colour.
| Lights in the basement in preparation for more painting |
| This is about 16% of the total to be hauled in and finished and put up |
Cath
Thursday, May 17, 2012
A loft is born
Well it took all day but I finished the loft floor. It gets a little tricky as you get to the end. There is no room to beat on the planks. I was running out of varethane but just had enough for all the edge finishing pieces. Kyla would be proud as she gave me that varethane at least 10 years ago.
So now we are going to paint the walls up there and I will finish the little bit of mudding on a couple of joints at the top. We are excited and anxious to put the carpet in place so we can move our insruments out of the way.
This is going to be a great space for jamming and practicing. Tomorrow I will put on the trim as it should be dry by then.
By the way I got to the 7th coat on the island and ran out of varethane.
Len
Wednesday, May 16, 2012
One man's ceiling is another man's floor
Second day of loft flooring and better progress was had. We now have a ceiling in the office and ready to start the flooring over to the front entrance.
| Office ceiling |
Tomorrow I should finish the last area. The real time consumer is the two coats of varethane which I stagger so there are always four pieces dry and ready to go. I also have four boards with a fresh second coat and four with a fresh first coat. I had to plane down the edge of one of the timbers as it had twisted enough to be out of level and was causing a lump in the floor. No big issues tomorrow I hope.
The strainer for the sink arrived as well as the last drawer bits so I will be at that after the flooring is completed.
Len
Tuesday, May 15, 2012
The loft is getting a floor
Started the day off with a lot of sanding to remove the old finish on the island top with a plan to put coats of varethane on as I did the floor boards.
| Three coats so far, 17 to go. |
The floor is started and looks good so far. A lot of twisted lumber so this is going to take a while.
| Still a little scary up here but soon it will be easier |
| Boards ready to go |
| Day one and I am up to the stairs |
| The bathroom has a ceiling |
| The finished oven unit with vents |
| Still waiting for a couple of drawer bits from Lee Valley |
And that was it for today
Len
Subscribe to: