Second day of loft flooring and better progress was had. We now have a ceiling in the office and ready to start the flooring over to the front entrance.
Office ceiling |
Tomorrow I should finish the last area. The real time consumer is the two coats of varethane which I stagger so there are always four pieces dry and ready to go. I also have four boards with a fresh second coat and four with a fresh first coat. I had to plane down the edge of one of the timbers as it had twisted enough to be out of level and was causing a lump in the floor. No big issues tomorrow I hope.
The strainer for the sink arrived as well as the last drawer bits so I will be at that after the flooring is completed.
Len