Friday, May 25, 2012

Ceiling is Half Done

Len tells me that the wood off the second lift was great - nice and straight and easy to put together.  So he was able to finish the whole loft side before band practice.  Today he will put up some trim at the rafters and hang the fan.  Then he can move on to the more challenging great room ceiling.  We have a bit of a system now which will really help, but need to use all four levels of scaffolding to reach the highest peak. That will mean lots of moving the scaffold back and forth as we only have one full set.  In the loft we used it in two pieces next to each other so Len could do the whole row without having to move the scaffold.

My favourite part is moving the scaffold from the loft to the main floor.  Actually easier than getting it up there, so that is a positive.

Will post some pictures later today or tomorrow.
Watch for it!
Cath