With the floor finished Cathryn went ahead and sealed up the grout. That sealer is darn expensive. I continued with the shower and fitted all the bottom row nice and level.
|
Spray sealant, easy peasy |
|
Some small spacers required to level up the floor |
One thing I will say about this Travertine tile, they are all a nice uniform 18 inches square, which is more than I can say for the floor tiles. I have found them to be plus or minus a 1/16th of an inch which makes for interesting gap alignment.
|
Fitting to the corner |
|
Bottom row done and on to the second course. |
|
There is a lot of cutting since you can't scribe and snap this stuff |
|
Two rows and the little wall is capped |
|
Two more rows to go |
I put a small shelf in the corner and when I complete the wall it will go all the way to the corner up to the top. When I went to cap the little wall I realized that it was going to need some grinding to get it level. This is where I changed gears and decided to install the bathroom door. This should help keep the dust localized and out of the rest of the house. Hah hah, lol etc.
|
Last door on the main floor |
Tomorrow I will sand and round over the shelf and wall top pieces. I might even grout what I have done so far. Then I will have to work on the vanity, building the cabinet and doing some plumbing.