So the master bath continues with slow daily progress. The tiling is complete on the floor of the shower so the grout has to be done before any walls go up
|
Bathroom chocolate grout, cake anyone |
|
We were worried the colour wouldn't come out so the tiles were sealed first |
Once the tiles were grouted I started finishing the floor. Soon I was on to the stub wall and I decided to go with the tiles at 45 degrees to match the floor joints
|
Finishing the floor |
|
It turned out fine |
|
The inside of the wall |
The inside of the wall was a bit trickier with the shelf extension and it's angle.
|
A few clamps and voila |
|
The grouted finish |
I then fit and secured the bottom section of backer board as it didn't interfere with any plumbing. We are still waiting for the secondary on off valve from Home Depot. I guess they decided that we didn't have a real physical address and cancelled our order. Would have been nice had they told us this tidbit of information. Anyway, I am waiting for the valve to test all the piping before I put up the top section.
|
Lower section secured |
|
Top section cut and fitted. |
Bruce asked me if I had any progress on the important part, my shop. I have been spending my weekends starting the big organize and have gotten about half way there.
|
Still working on tool location, drawers would be helpful |
|
I have placed my office area by the front doors and the window
|
I intend to close in the office area with a flat roof to accomodate some storage of larger items like the scaffold platforms and maybe some ladders.
|
Cessna landing gear |
I couldn't help opening up a couple of boxes to have a peak. I overhauled and painted these gear legs back in Kelowna a couple of years ago. They are all ready to go on, nice shiny white, but I digress.
Back to the bathroom
Len