Wednesday, September 21, 2011

Great Big Window Day

Well the day finally came.  All Len's preparation made it look almost easy.  A new friend and fellow musician,  Pat,  came over with two eager young men and the big window got put in.  It only took about 1/2 hour.  Lots of testosterone needed and used. (muscles).  Cath supervised and took a few pictures.
A big, heavy window - get it right side up and out!

Heave ho!

Inside the window is steadied and guided


Len puts in the first screws and everyone sighs a sigh of relief
Once the grunt work was done, Len finished putting on the tuck tape  and secured the window inside.  Then we sat back and took a look at the house with all it's windows.  Cool!
From the driveway

From the garden
Then it was back to work on the deck, using all the clamps.
Need more screws and more planks.  So far the count of screws in the deck is 3200 used.

A view from under the deck shows why we need so many screws - 3 to each board every 8 inches
The goal for tomorrow is to get as much deck done as possible.  Stay tuned.

1 comment:

  1. Did you say every 8 inches? Why are the joists so close together?

    ReplyDelete