Tuesday, June 29, 2010

More Logix blocks


Today was a full day of Logix fitting for the first course.  Hard to believe that it took Len all day, into the evening to ensure everything was straight and level.  Working with rough concrete footings was a challenge.  Jesse came out until 4.  After that Dad was able to help out.  It was great that Mom Hawkins was there to make a delicious meal so that we didn't starve. There is one picture that shows Cathryn helping Jesse send the Logix from the top loading area into the foundation area.  Then there is the "corner from hell".  Len worked on leveling the back corner of the garage for quite a long time.  Finally got it.  You can see Len spent a lot of time shaving the blocks with the help of his hand saw.  We need to take the laser level back to the rental place first thing in the morning, so it had to be completed tonight.  Good work everyone!  The worst of the blocks is now (hopefully) past.