The drywall continues with Norm and Lynn giving it their best as you will see. Norm says that I should be able to paint the wall where the stairs will be and the kitchen area by Thursday. They are doing a great job and quite quickly as far as I can tell.
Norm and Lynn hard at it |
I can't put varathane on the stair treads during the day as I have to wait till drywalling is done when Norm and Lynn head home. This being the case I have started on the railing for the loft area.
These are some of the timbers that were milled from trees on our property. |
I am going to use them for corner posts on the rail |
The planer is getting a workout |
I have my big vacuum set up and it sure saves the dust quotient |
Lots of sanding as well but they look great |
Finished sanding |
I will be milling the bottom of both of these posts to fit into a square hole at the top of the timbers
Here is one o the holes |
And here is the other |
Everyone has left so now I am on to the varathane. I am using the stair stringers for support as I won't be putting any varathane in the last 1 inch.
Set up and ready to go |
All done and time for a dog walk then dinner. |
It's 8:30 sounds like a pizza night.
Len
No comments:
Post a Comment