I've decided that the best kind of torture would be to have someone kneel down on a drywall screw. Let me tell you, I would give up any secrets I ever had thats for sure.
So I have to complete the door to the fireplace clean out before I drywall the area. I had the door and frame fabricated and now I have to secure it to the concrete blocks. I will be going into town tomorrow for anchors then I'll finish that wall.
 |
Looking into the ash pit area |
 |
Here is the door and frame ready for paint and install |
 |
Lower bathroom hall completed |
 |
Just the beam to cover and then the media cupboard |
 |
I built in the sub panel and now I will drywall it |
More tomorrow
Len
No comments:
Post a Comment