|
Grampa finishing the parging |
|
First coat of paint on the top unit. |
Thursday was a nice day and so Grampa decided to finish up the parging. Lucky choice because as soon as he finished, the skies darkened, the wind came up and they had a real downpour and thunderstorm. There is lots to be done inside, so he started putting up walls upstairs.
|
building interior walls |
On Friday afternoon, the other half of the Dunkleys, Mom and I, arrived and Grampa put us to work.
|
We started on our first job to unscrew screws from plywood strips that were used on the shed to hold down the black tarpaper. |
|
Mom sorting the plywood strips from the ones Grampa had for the siding installations. |
|
Miss muscles moving long two by four's to make a wall. |
|
Grampa and I laying out the studs for the bedroom |
We are making the wall separating walk in closet to the bathroom.
|
Mom still sorting the plywood strips |
She's putting the water proof ones under that black tarp and putting the ones Len made into the firewood pile.
Today were going to be splitting firewood and building a wall. Grandma and Mom are getting two pocket doors at Bridge Lake about a half an hour away. Will be needing to get that done then Grampa's going to move a window ten inches to the right.
Victoria
No comments:
Post a Comment