The boys were able to get up 90% of the green fascia which looks great. I will be going up this coming weekend to help Ross finish the trim.
| Front entrance with temporary posts |
| North garage and upper room windows |
| West facing walls |
I did have an issue to deal with concerning the 2x4 strapping at the roof peak on the great room. The boys put the top 2 pieces of 2x4 right up to the top without leaving a gap for ventilation, 2 inches was required. Up I went with a skil saw and, set at 45 degrees, I cut a slot down the length of the roof. Of course the saw didn't quite get all the way through so I had to make a second pass with a hammer and chisel. I must have cut through about 20 nails, the saw wasn't cutting very well by the time I was finished. Straddling the peak to do this work out one way and then all the way back, another task I could have done without. It's done now and we are almost ready for the roofers who are coming on the 8th of October. I am really looking forward to being able to keep the water off of the floors.
I plan on stapling up some house wrap and placing a couple of windows for sure this coming weekend. It is such a nice drive through Little Fort especially now with all the fall colours.